What should be done after a bug is found?

The bug needs to be communicated and assigned to developers that can fix it. After the problem is resolved, fixes should be re-tested, and determinations made regarding requirements for regression testing to check that fixes didn't create problems elsewhere. If a problem-tracking system is in place, it should encapsulate these processes. A variety of commercial problem-tracking/management software tools are available. The following are items to consider in the tracking process:

  • Complete information such that developers can understand the bug, get an idea of its severity, and reproduce it if necessary.
  • Bug identifier (number, ID, etc.)
  • Current bug status (e.g., 'Released for Retest', 'New', etc.)
  • The application name or identifier and version
  • The function, module, feature, object, screen, etc. where the bug occurred
  • Environment specifics, system, platform, relevant hardware specifics
  • Test case name/number/identifier
  • One-line bug description
  • Full bug description
  • Description of steps needed to reproduce the bug if not covered by a test case or if the developer doesn't have easy access to the test case/test script/test tool
  • Names and/or descriptions of file/data/messages/etc. used in test
  • File excerpts/error messages/log file excerpts/screen shots/test tool logs that would be helpful in finding the cause of the problem
  • Severity estimate (a 5-level range such as 1-5 or 'critical'-to-'low' is common)
  • Was the bug reproducible?
  • Tester name
  • Test date
  • Bug reporting date
  • Name of developer/group/organization the problem is assigned to
  • Description of problem cause
  • Description of fix
  • Code section/file/module/class/method that was fixed
  • Date of fix
  • Application version that contains the fix
  • Tester responsible for retest
  • Retest date
  • Retest results
  • Regression testing requirements
  • Tester responsible for regression tests
  • Regression testing results

A reporting or tracking process should enable notification of appropriate personnel at various stages. For instance, testers need to know when retesting is needed, developers need to know when bugs are found and how to get the needed information, and reporting/summary capabilities are needed for managers

Comments

Popular posts from this blog

SQL SERVER Questions And Answers

SQL SERVER Questions And Answers 1. What is an Entity? The basic data item stored in database is called entity. An entity can be any object, item, place, person, concept, or activity about which data is stored. 2. What is an attribute? An attribute is a property of an entity. It describes a part of an entity. Entity could have one or more attributes. 3. What is ER diagram? An Entity Relationship Diagram is diagrammatic representation of the logical structure of a database system. 4. Describe the concept of keys. Candidate key An attribute that uniquely identifies a row is called candidate key. It is also called das surrogate key. Primary key A candidate key that you choose to identify rows uniquely is called a primary key. Alternate key If there are multiple candidate keys in a table, the candidate keys that are chosen as primary key are called the alternate keys. Composite key When the key that uniquely identifies the rows of a table is made up of more than one attribute, it is ca...

Testing Measurement

Someone has rightly said that if something can not be measured, it can not be managed or improved. There is huge value in measurement, but you should always make sure that you get some value out of any measurement that you are doing. You should be able to answer the following questions: What is the purpose of this measurement program? What data items you are collecting and how you are reporting it? What is the correlation between the data and conclusion? Value addition: Any measurement program can be divided into two parts. The first part is to collect data, and the second is to prepare metrics/chart and analyses them to get the valuable insight which might help in decision making. Information collected during any measurement program can help in: Finding the relation between data points, Correlating cause and effect, Input of future planning. Normally, any metric program involves certain steps which are repeated over a period of time. It starts with identifying what to measure. After t...

What’s New with QTP 9.5?

This is the general overview giving the brief description of what is new in QTP9.5 New Features: 1.  New design time panes: Various new IDE panes have been introduced which does not provide any new functionality to add up but basically the operations which were in the deep sub menus are now put up in front. Available Keyword Pane: This pane shows all the available functions in the current test (either in-action or externally added), as well as all the objects in your object repository (local and external). The items are effectively separated into groups, making it easier to search for a relevant item. Double clicking any item in the pane will open it, and dragging the item to the main window will add it to the script in the drop position. Double clicking a function will not only open the hosting file in the main window, but also focus on the exact position of the function within the file. Test Flow Pane: This pane lays out the action call structure of the current test. It outlines...